精品国产一区二区三区蜜殿,欧美巨大在线视频,国产一级AB视频,婷婷五月成人精品电影一区二区

Online Service
Scan it
Support hotline
18681482740
Service Hotline:
18681482740
中文  |   English
Industry knowledge
Contact

Address: Floor 1, Building 2, Quanshengchang Industrial Park, Buyong Shajing Road, Shajing Street, Shenzhen

Contact: Mr. Li 18681482740

Email: lilinhan1314@126.com

Website:

Industry knowledge
Assembly of upper mold seat for precision stamping molds
07-19 / 2024

In order to shorten the processing cycle of stamping molds, enhance mold accuracy, unify the methods of operators, reduce anomalies that may occur during mold production, ensure production quality and mold life, the following explanation is given to the assembly process of the upper mold seat of the stamping mold.




The assembly of the upper die seat of the stamping mold is completed in the following 10 steps:




1. Splint Φ 12.000 positioning holes and auxiliary guide pillar holes, with a circumferential chamfer of R1.0 and polished




2. Use a 600 # oilstone or diamond file to remove burrs from the frame opening.




3. Use 600 #~1000 # oilstones to flatten both sides of the template and remove any burrs.




4. Use kerosene and alcohol to clean the mold surface and inner holes.




5. Install the auxiliary guide set into the same template.




6. Place the clamping part of the punch into the template frame and check if the punch is smoothly removed and placed. (Do not put the punch in after it is closed to avoid accidentally breaking the small punch)




7. Fix the punch with a pressure plate. (Note that the pressure plate should not be too close to the punch to avoid interference with the punch.) After fixing the punch, there should be a small amount of movement space to facilitate the natural alignment of the punch.




8. Gently close the detachment plate and the detachment back plate together into the clamp plate, and check if there is any interference in the positioning of the detachment back plate's pressing plate. When fully closed, there should be no gap between the detachment back plate and the clamp plate.




9. After joining, the cutting punch should exceed the pressing surface by more than 0.8mm (minus material thickness).




10. Insert the adjustment rod and upper mold adjustment punch, and rotate the screw until the adjustment punch approaches the effective height.






Through the above 10 steps, the assembly of the upper mold seat of the stamping mold has been completed.






Licao Precision is an ODM/OEM professional manufacturer specializing in the design and manufacturing of precision stamping molds and precision hardware stamping.


Links:Zibo CNC machine tool automatic car washing machine Qingdao refrigeration equipment grinder equipment steel grit fire inspection cabinet sweeper motor desulfurization denitrification equipment drawing mold washing machine automatic soldering machine server repair HART475 hand operator dust-free cloth dust-free paper stack screw type Sludge dehydration machine, precision repair welding machine, Shandong motor repair, rotary hot pot equipment, integrated ultrasonic cleaning machine, Zhongjie radial drilling machine, beer equipment, Shenzhen brass manufacturer, welcome lamp, lens digging, drilling rig, aluminum housing manufacturer, automatic dispensing machine, automatic screwing machine neodymium Iron boron magnet 4g router wireless bridge
We provide you with high quality products
漾濞| 久久久综合九色综合88| 亚洲国产人成自久久国产| 国产精品免费精品自在线观看| 亚洲精品无码午夜福利中文字幕 | 午夜小福利| 夜夜躁狠狠躁日日躁2002讲述| 加勒比无码一区二区三区| 天天综合网亚在线| 国产精品亚洲А∨天堂| 久久久久亚洲波多野结衣| 久久久国产精品无码一区二区| 男女| 日韩精品一区二区三区四区蜜桃| 狠狠操人妻| 日女人b| zozozo女人极品另类| 99热这里只有精品99| 狼人色综合| 五月婷婷丁香综合| www.日日夜夜| 少妇网站| 久操综合| 欧美日韩精品| 国产传媒| 亚洲伊人色| 91精品久久久久久久| 免费黄色在线看| 国产综合亚洲区在线观看| 色妞av| 看AV免费毛片手机播放| 老色驴| 亚洲精品无码专区在线观看| 99久久综合狠狠综合久久止| 亚洲一区无码精品色| 欧美野性肉体狂欢大派对| 高清视频大片免费观看| 建德市| 亚洲成A人片在线观看无码变态 | 国产精品视频熟女韵味| 国产精品三级在线观看无码|